Langstaff Road
The EA Study will look at improvements to Langstaff Road, including a connection across the CN MacMillan Yard and interchange improvements at Highway 400 in the City of Vaughan.
Project Background
Within the study area, the Regional road network will be very congested without additional east-west capacity and there are limited existing facilities for active transportation.
Langstaff Road is proposed to be widened to six lanes between Weston Road and Dufferin Street, including a connection across the CN MacMillan Yard. This project is intended to:
- Increase network accessibility and flexibility
- Reduce delays for residents and businesses
- Relieve and diffuse demands on arterial roads
- Provide connections between communities and local amenities (e.g. schools, local retail, etc.)
- Support efficient transit uses
- Support pedestrian and cyclist uses
- Increase efficiency of the transportation network
Environmental Study Report
The Regional Municipality of York has completed a Schedule ‘C’ Municipal Class Environmental Assessment Study for the proposed improvements to Langstaff Road from Weston Road to Highway 7. The study reviewed the growth in the area and identified improvements needed to accommodate existing and future transportation needs of this area as part of the Regional road network.
The study recommends improvements including widening Langstaff Road to six lanes between Weston Road and Dufferin Street, providing sidewalks and cycle tracks and a proposed future connection across the CN MacMillan Rail Yard and a proposed separation of the road and rails at the Metrolinx GO Barrie Line. Improvements associated with the Highway 400/Langstaff Road interchange are subject to a future highway corridor study
York Region has prepared an Environmental Study Report (ESR) documenting the study process, consultation efforts and recommended plan. This Notice of Completion places the ESR on the public record for a 30-day review period, beginning January 13, 2022.
Environmental Study Report:
Langstaff Road Class EA ESR - January 2022 PART 1
Langstaff Road Class EA ESR - January 2022 PART 2
Langstaff Road Class EA ESR - January 2022 PART 3
Langstaff Road Class EA ESR - January 2022 PART 4
Langstaff Road EA - ESR Errata - August 2022
Appendices
Appendix A - The Preferred Design Plan - Plates 1-12
Appendix A - The Preferred Design Plan - Plates 13-24
Appendix B - Interim Four Lane Concept Plan
Appendix C - Consultation Record - Part 1 - Public Consultation
Appendix C - Consultation Record - Part 2 - Public Consultation
Appendix C - Consultation Record - Part 3 - Correspondence Record
Appendix C - Consultation Record - Part 4 - Correspondence Record
Appendix C - Consultation Record - Part 5 - Correspondence Record
Appendix C - Consultation Record - Part 6 - Correspondence Record
Appendix C - Consultation Record - Part 7 - CN Meeting Minutes
Appendix C - Consultation Record - Part 8 - MTO Meeting Minutes
Appendix C - Consultation Record - Part 9 - Metrolinx Meeting Minutes
Appendix C - Consultation Record - Part 10 - City of Vaughan Meeting Minutes
Appendix C - Consultation Record - Part 11 - TRCA Meeting Minutes
Appendix D - Traffic Analysis Report - Part 1
Appendix D - Traffic Analysis Report - Part 2
Appendix E - Stage 1 Archaeological Assessment
Appendix F - Cultural Heritage Assessment Report
Appendix G - Natural Environment Report
Appendix H - Tree Protection Report
Appendix I - Drainage and Stormwater Management Report
Appendix J - Hydrogeology Report - Part 1
Appendix J - Hydrogeology Report - Part 2
Appendix J - Hydrogeology Report - Part 3
Appendix K - Contamination Overview Study
Appendix L1 - Structural Design Report CN MacMillan Yard Crossing Structures
Appendix L2 - Structural Design Report Bowes Bridge
Appendix L3 - Structural Design Report GO Transit Overhead L3
Appendix M - Geotechnical Report
Appendix N - Noise Assessment Report
Appendix O - Air Quality Assessment
Public Notices
Notice of Completion January 2022
Resident Notice of Completion January 2022
Notice of Open House Two November 2018
Notice of Open House One June 2017
Notice of Commencement December 2016
Public Open Houses
Throughout the duration of the EA Study, the public is encouraged to provide comments, feedback and submit questions regarding the project.
Open House One – Wednesday, June 14, 2017
The first Open House was held at Westmount Event Centre in the City of Vaughan. The following information was provided:
- Purpose of the study
- Planning for the future
- Socio-Economic, Cultural Heritage, Natural, Cycling and Pedestrian Environments
- Transit Network
- Traffic Analysis
- Problems and Opportunities
- Evaluation Criteria and Recommendations
Review Presentation Materials: Open House One Display Boards (PDF)
Open House Two – Wednesday, November 28, 2018
York Region is hosting a second open house where the recommended designs for Langstaff Road and an update on the Highway 400 interchange improvements will be presented. You are invited to discuss key issues with the project team and provide your input. The open house will be held on:
Date:
Wednesday, November 28, 2018
Time:
Visit anytime between 6:30 p.m. to 8:30 p.m.
Location:
Westmount Event Centre, Room B
227 Bowes Road, City of Vaughan
Please let us know if you require accommodations to participate.
If you cannot attend, information from the open house will be posted on this page. An online survey will also be made available for the public to provide comments on the proposed improvements. Please check back here on or after November 28.
Open House Two Display Boards (PDF)
View Recommended Plan 1 (PDF)
View Recommended Plan 2 (PDF)
View Recommended Plan 3 (PDF)
Road, Municipality: Langstaff Road, Vaughan
Project Number: 99540, 99806, 99805