Project Background

Environmental Assessment Studies A and B

The Regional Municipality of York is undertaking two transportation Environmental Assessment Studies (EA Studies) for 16th Avenue. “Study A” is between Yonge Street and Woodbine Avenue in the Town of Richmond Hill and the City of Markham and “Study B” is between Woodbine Avenue and York/Durham Line in the City of Markham.

The two EA Studies will identify possible improvements to 16th Avenue to accommodate the current and future transportation needs of pedestrians, cyclists, transit users and motorists along this corridor.


Environmental Study Report for “Study B”

The Regional Municipality of York has completed an Environmental Assessment (EA) Study for improvements to 16th Avenue to accommodate the current and future transportation needs of pedestrians, cyclists, transit users and motorists. The study, referred to as “Study B,” is located in the City of Markham from Woodbine Avenue to York/Durham Line.

The EA Study for “Study A,” which extends from Yonge Street to Woodbine Avenue, was completed in 2018. The Environmental Study Report for “Study A” can be viewed below “Study B”.

The recommendations identified in the 16th Avenue EA for “Study B” include:

  • Widening to six lanes from Woodbine Avenue to McCowan Road to accommodate transit and high occupancy vehicle (HOV) lanes
  • Adding continuous cycling and pedestrian facilities and streetscaping from Woodbine Avenue to Donald Cousens Parkway
  • Constructing paved shoulders from Donald Cousens Parkway to York/Durham Line
York Region has prepared an Environmental Study Report (ESR) documenting the study process, consultation efforts and recommended plan. This Notice of Completion places the ESR on public record for public review, starting December 19, 2019.

Environmental Study Report:

16th Avenue from Woodbine Avenue to York/Durham Line Report

Appendices:

Appendix A1 Preliminary Design Drawings 01-09
Appendix A1 Preliminary Design Drawings 10-18
Appendix A1 Preliminary Design Drawings 19-27
Appendix A1 Preliminary Design Drawings 28-37
Appendix A1 Preliminary Design Drawings 38-44
Appendix A1 Preliminary Design Drawings 45-53
Appendix A1 Preliminary Design Drawings 54-59
Appendix A1 Preliminary Design Drawings 60-69
Appendix A1 Preliminary Design Drawings 70-78
Appendix A1 Preliminary Design Drawings 70-156
Appendix A2 Design Drawing Notes
Appendix B1 Consultation Notice of Commencement
Appendix B2 Consultation Open House 1 Report and Appendix A-B
Appendix B2 Consultation Open House 1 Appendix C-F
Appendix B3 Consultation Open House 2 Report and Appendix A-B
Appendix B3 Consultation Open House 2 Appendix C-F
Appendix B4 Consultation Drop-in Session Summary
Appendix B5 Consultation Notice of Completion
Appendix C Public Comment Tracking
Appendix D Agency and Stakeholder Correspondence Minutes
Appendix E 16th Avenue Indigenous Consultation
Appendix F Transportation and Traffic Analysis Reports Part 1
Appendix F Transportation and Traffic Analysis Reports Part 2
Appendix G1 Natural Heritage Report
Appendix G2 Arborist Report
Appendix H Cultural Heritage Report
Appendix H Cultural Heritage Appendices
Appendix I Stage 1 Archaeology
Appendix J Noise Report and Figures
Appendix J Noise Appendices
Appendix K Geotech
Appendix L Structural Assessment
Appendix M Fluvial Geomorphology Report
Appendix M Fluvial Geomorphology Appendix A- B
Appendix M Fluvial Geomorphology for web Appendix C-Partial
Appendix M Fluvial Geomorphology Appendix C-D
Appendix N Hydrogeology
Appendix O Drainage and SWM
Appendix P Air Quality

Appendix Q Contamination




Environmental Study Report for “Study A”

The Regional Municipality of York completed a Schedule ‘C’ Class Environmental Assessment (Class EA) Study for improvements to 16th Avenue to accommodate the current and future transportation needs of pedestrians, cyclists, transit users and motorists. The study, referred to as “Study A,” is located in the Town of Richmond Hill and City of Markham from Yonge Street to Woodbine Avenue.

The second ongoing EA for 16th Avenue, referred to as “Study B,” extends from Woodbine Avenue to York/Durham Line. A separate Environmental Study Report will be made available for this at a later date.

The recommendations identified in the Class EA study for “Study A” include widening 16th Avenue from four to six lanes to accommodate transit and high occupancy vehicle (HOV) lanes, adding continuous cycling and pedestrian facilities, and streetscaping.

York Region has prepared an Environmental Study Report (ESR) for “Study A” documenting the study process, consultation efforts and recommended plan. Please note that the public commenting period for the “Study A” ESR ended on January 27, 2019; however, it can still be viewed below. The ESR for “Study B” will be made available for public review in 2019.

Environmental Study Report:

16th Avenue from Yonge Street to Woodbine Avenue Report

Appendices:
Appendix A01 Preliminary Design Sheets 01-10
Appendix A02 Preliminary Design Sheets 11-21
Appendix A03 Preliminary Design Sheets 22-32
Appendix A04 Preliminary Design Sheets 33-42
Appendix A05 Preliminary Design Sheets 43-53
Appendix A06 Preliminary Design Sheets 54-64
Appendix B01 Public Consultation
Appendix B02 Public Consultation Appendix A Part 1_
Appendix B03 Public Consultation Appendix A Part 2_
Appendix B04 Public Consultation Appendix B
Appendix B05 Public Consultation Appendix C
Appendix B06 Public Consultation Appendix D
Appendix B07 and B08 Public Consultation Appendix E and F
Appendix C Public Comment Tracking
Appendix D Agency and Stakeholder Correspondence Minutes
Appendix E 16th Ave_Indigenous Consultation
Appendix F01 Transportation and Traffic Analysis Reports Main and Appendix A
Appendix F02 Transportation and Traffic Analysis Reports Appendix B
Appendix G01 Natural Environment Report
Appendix G02 Natural Environment Report Appendices A B C
Appendix G03 Natural Environment Arborist Report
Appendix H01 Built Heritage and Cultural Landscapes
Appendix H02 Built Heritage and Cultural Landscapes Appendices A B
Appendix I Stage 1 ArchaeologyAppendix L Structural Assessment
Appendix J Noise Assessment Report
Appendix K01 to K07 Geotechnical and Foundations Report Part A and Appendix A to Appendix F
Appendix K08 Geotechnical and Foundations Report Appendix G
Appendix L Structural Assessment
Appendix M01 Fluvial Geomorphology Main Doc Appendix A and B
Appendix M02 Fluvial Geomorphology Appendix C1
Appendix M03 Fluvial Geomorphology Appendix C2
Appendix M04 Fluvial Geomorphology Appendix D
Appendix N Hydrogeological Report
Appendix O Drainage and SWM Report
Appendix P Air Quality Assessment
Appendix Q Contamination Overview Study


Public Notices

Study A:

Notice of Commencement June 20, 2016

Open House Notice November 10, 2016

Open House 2 Notice September 28, 2017

Notice of Completion December 13, 2018

Study B:

Notice of Commencement June 20, 2016

Open House Notice November 10, 2016

Open House 2 Notice September 28, 2017

Notice of Completion December 19, 2019


Public Open Houses

Open house 1 for 16th Avenue EA Study was held in November, 2016. The public is encouraged to provide their comments and questions regarding this study.

Open House 1 Materials
  • Display Boards
  • Summary Report (low resolution PDF)
    For a print version of the report please contact the Project Manager

Open house 2 for 16th Avenue EA Study will be held in October 2017. The public is encouraged to provide their comments and questions on the recommended designs for 16th Avenue.

Open House 2

  • Tuesday October 10, 2017 – Edward T. Crowle Public School, Markham
  • Wednesday, October 11, 2017 - Pierre Elliott Trudeau High School, Markham
  • Tuesday October 17, 2017 – York Region Transit/Viva Bus Depot, Richmond Hill

Open House 2 Materials

*Draft Recommended Design Plans will be updated and revised as required based on feedback from agencies and the public.


Road, Municipality:

16th Avenue, Richmond Hill and Markham

Project Numbers:

82700, 83390, 84008, 84170, 85600, 85610, 99180, 99510

To submit a comment, question or for more information, please contact:

Teresa Vader
Communications and Community Engagement Specialist 
1-877-464-9675 ext. 75889
Email: roads.ea@york.ca


Related Resources

Learn more about Environmental Assessments
2016 Transportation Master Plan
2016 Regional Official Plan
Road Construction Schedule
Road Maintenance


 


Environmental Assessment Study A and B on 16th Avenue in Richamond Hill and Markham,EA,York/Durham Line,Yonge Street,markham,richmond hill,construction,new roads The Regional Municipality of York en-US 16th Avenue EA Environmental Assessment Study A and B on 16th Avenue in Richamond Hill and Markham.

Events Calendar


  • More events