Teston Road IEA Study
In the City of Vaughan
The Regional Municipality of York completed a Comprehensive Environmental Assessment (EA) Study in the City of Vaughan to identify road improvements near Teston Road. The study area is bounded by Kirby Road, Bathurst Street, Major Mackenzie Drive West and Highway 400.
As required under section 6.2(1) of the Environmental Assessment Act and according to the Terms of Reference approved by the Ministry of the Environment, Conservation and Parks on December 20, 2018, York Region submitted its environmental assessment to the Ministry of the Environment, Conservation, and Parks for review and a decision.
The Teston Road Area EA Study aims to generate solutions for transportation challenges and opportunities. The project considered improvements for vehicles, pedestrians, cyclists and transit in the study area.
Recommended Improvements
- Widening Teston Road from two to four lanes west of Keele Street to Rodinea Road and from Dufferin Street to Bathurst Street
- Extending Teston Road as a new four-lane roadway from Rodinea Road to Dufferin Street; a modified short-term solution is proposed along Teston Road (Keele to Dufferin) with a multi-use path
- Constructing an at-grade GO Rail crossing on Teston Road east of Keele Street with property protection to separate the road and tracks in the future, if needed
As required under the Ontario Environmental Assessment Act, York Region released the CEA Study Report for public review from February 27 to April 17, 2026. The commenting period is now closed.
The Comprehensive Environmental Assessment Report has been updated in response to public, stakeholder and Indigenous community comments received during the commenting period.
The Teston Road CEA Study has been submitted to the Ministry of the Environment, Conservation and Parks for review and approval.
View the Comprehensive Environmental Assessment Report
- Teston Road IEA Report
- Appendix A - Terms of Reference
- Appendix B.1 - Preferred Design Plan
- Appendix B.2 - Preferred Design Plan
- Appendix C1.1 - Consultation Record
- Appendix C1.2 - Consultation Record
- Appendix C1.3 - Consultation Record
- Appendix C1.4 - Consultation Record
- Appendix C1.5 - Consultation Record
- Appendix C1.6 - Consultation Record
- Appendix C1.7 - Consultation Record
- Appendix C1.8 - Consultation Record
- Appendix C1.9 - Consultation Record
- Appendix C.2.1 - Indigenous Consultation
- Appendix C.2.2 - Indigenous Consultation
- Appendix D.1 - Transportation Memo 1
- Appendix D.2 - Transportation Memo 2
- Appendix D.3 - Transportation Memo 3
- Appendix E.1 - Natural Environmental Report
- Appendix E.2 - Natural Environmental Report
- Appendix E.3 - Natural Environmental Report
- Appendix F.1 - Arborist Report
- Appendix F.2 - Arborist Report
- Appendix G.1 - Environmental Noise Report
- Appendix G.2 - Environmental Noise Report
- Appendix G.3 - Environmental Noise Report
- Appendix G.4 - Environmental Noise Report
- Appendix H - Air Quality Report
- Appendix I - Stage 2 Archaeological Assessment
- Appendix J - Cultural Heritage Report
- Appendix K.1 - Drainage & Stormwater Management Report
- Appendix K.2 - Drainage & Stormwater Management Report
- Appendix K.3 - Drainage & Stormwater Management Report
- Appendix K.4 - Drainage & Stormwater Management Report
- Appendix K.5 - Drainage & Stormwater Management Report
- Appendix K.6 - Drainage & Stormwater Management Report
- Appendix L - Hydrogeology Report
- Appendix M - Contamination Overview Study
- Appendix M - Contamination Overview Study - Appendix C
- Appendix N.1 - Phase I ESA Report - Property 1 & 2
- Appendix N.1 - Phase I ESA Report - Property 1 & 2 - Appendix D
- Appendix N.2 - Phase I ESA Report - Property 3
- Appendix N.2 - Phase I ESA Report - Property 3 - Appendix D
- Appendix N.3 - Phase I ESA Report - Property 4
- Appendix N.3 - Phase I ESA Report - Property 4 - Appendix D
- Appendix N.4 - Phase I ESA Report - Property 5
- Appendix N.4 - Phase I ESA Report - Property 5 - Appendix D
- Appendix N.5 - Phase I ESA Report - Property 6
- Appendix N.5 - Phase I ESA Report - Property 6 - Appendix D
- Appendix N.6 - Phase I ESA Report - Property 7
- Appendix N.6 - Phase I ESA Report - Property 7 - Appendix D
- Appendix N.7 - Phase I ESA Report - Property 8
- Appendix N7 - Phase I ESA Report - Property 8 - Appendix D
- Appendix O - Soil Waste & Landfill Gas Report
- Appendix P - Fluvial Erosion Hazard Report
- Appendix Q - Climate Change Report
- Appendix R.1 - Foundation Design Report
- Appendix R.2 - Pavement Design Report
- Appendix S - Structural Design Report
- Appendix T - Evaluation Table for Alternative Methods
- Appendix U - Evaluation for Alternative Design
- Appendix V - Design Criteria
- Appendix W - Preliminary Cost Estimate
Project Background
Public consultation is an important part of the IEA Study and York Region welcomes resident and stakeholder feedback throughout the study. Information about the study is posted on this page and on York Region’s Facebook and Twitter channels.
In December 2018, the Minister of the Environment, Conservation, and Parks approved the Terms of Reference for the Teston Road Area Transportation Improvements study. A copy of the approved Terms of Reference is available below.
Terms of Reference
As part of the planning process, York Region has developed the Terms of Reference to guide the future Individual Environmental Assessment Study.
- Teston Road IEA Terms of Reference Document
- Consultation Record
- Appendix A - Stakeholder List
- Appendix B - Consultation During Study
- Appendix C - Consultation During Pre-Submission
- Appendix D - Visual of Project Website
- Appendix E - Newspaper Notifications
- Appendix F - Open House Summary Report
- Appendix G - Agency Meeting Minutes
- Appendix H - Comments Responses Final
On December 20, 2018, the Minister of the Environment, Conservation and Parks has approved the Terms of Reference for the preparation of the Teston Road Area Transportation Improvements Environmental Assessment.
Public Notices
- Notice of Submission of Environmental Assessment - February 23, 2026
- Public Notice - November 8, 2024
- Notice of Open House #4 – November 23, 2023
- Notice of Open House #3 – March 17, 2022
- Notice of Open House #2 – November 25, 2021
- Notice of Open House #1 – July 23, 2021
- Notice of Commencement of Study – August 13, 2020
- Notice of Submission – June 7, 2018
- Notice of Open House – April 6, 2017
- Notice of Commencement for Terms of Reference – December 29, 2016
Public Open Houses
Throughout the EA Study, the public is encouraged to provide comments and feedback and submit questions regarding the project.
Open House 4 - December 1 to December 22, 2023
The following information was provided:
- Study progress since the third online open house
- Design considerations, preliminary design, potential impacts and mitigation measures
Open House 4 Material:
- Project Summary - Presentation (PDF)
- Project Summary - Video (13 minutes)
- Open House #4 Presentation (PDF)
- Open House #4 Video (23 minutes)
Open House 3 – March 21 to April 11, 2022
The following information was provided:
- Study progress since the second online open house
- Alternative designs to extend Teston Road from Keele Street to Dufferin Street
Open House 3 Material:
- Project Summary - Presentation (PDF)
- Project Summary - Video (6 minutes)
- Open House #3 Presentation (PDF)
- Open House #3 Video (26 minutes)
Open House 2 – November 29 to December 20, 2021
The following information was provided:
- Background and summary of the study
- Alternative Methods to extend Teston Road between Keele Street and Dufferin Street
Open House 2 Material:
- Project Summary - Presentation (PDF)
- Project Summary - Video (5 minutes)
- Open House #2 Presentation (PDF)
- Open House #2 Video (25 minutes)
Online Open House 1 – July 26 to August 23, 2021
The following information was provided:
- Background and summary of the study
- Problems and opportunities identified
- Alternatives being proposed
- Next steps in the study
Open House 1 Material:
- Project Summary - Presentation (PDF)
- Project Summary - Video (5 minutes)
- Open House #1 Presentation - Part 1 (PDF) | Part 1 Video (18 minutes)
- Open House #2 Presentation - Part 2 (PDF) | Part 2 Video (24 minutes)
Project Information Session — April 18, 2017
The following information was provided:
- What is the ToR?
- Problems and Opportunities
- What happens next in the Study?
Material:
Join the Project Mailing List
To be added to the project mailing list, please contact us at @email or 1-877-464-9675 ext. 75000.
Road, Municipality: Teston Road, Vaughan
Project Number: 99816